Construction
What Should a Construction Pro Charge Per Hour?

Ask ten contractors what they charge per hour and you will get ten different numbers, and most of them are guesses. Somebody heard the guy down the road bills $85, so they bill $85. The problem is you have no idea what that guy's overhead is, how many hours he actually sells in a week, or whether he is even making money. Your construction hourly rate should come from your numbers, not his. This post walks through how to work backwards from the income you want to a rate that covers your real costs and still leaves you a paycheck.
Key takeaways
- Your hourly rate should be built from target income, real overhead, and honest billable hours, not from what a competitor charges.
- Billable hours are a fraction of the hours you work. Most field pros bill far fewer hours than a 40-hour week suggests.
- Overhead recovery is where most contractors bleed money. If your rate does not carry insurance, fuel, tools, and admin time, you are paying to work.
- Think in ranges, test, and adjust. There is no single correct number, only a rate that keeps you solvent and growing.
Why copying a competitor's rate is a trap
Here is the uncomfortable truth: that competitor's rate is built for his business, not yours. Maybe he has a paid-off truck and you have a lease. Maybe he works out of his garage and you rent a shop. Maybe he is undercharging and will be out of business in eighteen months. When you copy a number, you inherit a set of assumptions you can't see.
Rates also carry different structures. Some pros fold materials markup into a higher hourly number. Others bill labor low and make margin on materials. Two shops charging the same per hour can have completely different profitability. The rate is just the tip of the iceberg, and you only see the tip.
Rule of thumb
Use competitor rates as a sanity check for your market, never as the starting point for your own math. If your calculated rate lands far above the local range, the issue is usually billable hours or overhead, not your market.
Start with the number that matters: your take-home
Work backwards. Begin with what you want to earn in a year, then build the rate up from there. Be honest about the salary you need to live, not the bare minimum you can survive on. If you want to pay yourself $80,000 a year, that is your anchor.
From there you add in the cost of running the business and the reality that you can't bill every hour you work. Those two factors are what separate a wishful number from a rate that holds up on a real invoice.
Billable vs unbillable hours: the gap that sinks most shops
This is the single biggest mistake contractors make. You assume a 40-hour week means 40 billable hours. It doesn't. Driving between jobs, picking up materials, writing quotes, chasing payments, returning calls, maintaining equipment: none of that bills directly to a customer, but all of it eats your day.
For most field-service and trade pros, typical billable hours land somewhere between 50 and 75 percent of the hours you actually work. A solo operator handling his own quotes and admin often falls near the lower end. If you work 2,080 hours a year on paper and bill 60 percent of them, that is roughly 1,250 billable hours, not 2,080.
The fix
The more admin you can batch or automate, quoting, scheduling, invoicing, follow-up, the higher your billable percentage climbs. Every hour you claw back from paperwork is an hour you can sell.
Overhead recovery: the costs hiding in plain sight
Overhead is everything you spend to stay in business that isn't direct job labor or materials. Most contractors drastically underestimate it. Walk through the real list:
- Liability and workers' comp insurance
- Vehicle costs: payments, fuel, maintenance, registration
- Tools, equipment, and replacement
- Phone, software, and subscriptions
- Licensing, bonding, and permits
- Accounting, legal, and admin time
- Marketing and lead generation
- Unpaid time quoting jobs you don't win
Add it all up for the year. If you don't recover that total through your rate, you are effectively subsidizing your customers out of your own pocket. Spread the annual overhead across your billable hours and you get the overhead cost baked into every hour you sell.
A worked example, start to finish
Let's build a rate for a solo contractor. Round numbers to keep it clear.
- Target take-home pay: $80,000 per year.
- Annual overhead (insurance, truck, tools, software, admin, marketing): $35,000.
- Total you need the business to cover: $115,000.
- Hours worked per year: 2,080.
- Billable percentage: 60 percent, so 1,248 billable hours.
- Base rate to cover pay and overhead: $115,000 divided by 1,248 equals about $92 per hour.
- Add a profit margin on top of your pay (say 15 percent) so the business can grow, absorb slow seasons, and reinvest: roughly $106 per hour.
Notice what happened. If this contractor had copied a competitor at $75 an hour, he would be short by more than $30 an hour on every ticket. Over 1,248 billable hours, that is a gap of nearly $40,000 a year. That is the difference between a business that grows and one that quietly goes broke while staying busy.
Run your own version
Change the inputs to match your reality. A crew with employees, a financed fleet, or higher insurance will land at a different number. The method stays the same: pay plus overhead plus profit, divided by real billable hours.
Turning your rate into jobs you actually win
A correct rate on paper is worthless if it scares off every customer or gets lost in sloppy quoting. Two things close the gap. First, present your price with confidence and a clear scope so the customer sees value, not just a number. Second, make the back office so smooth that you protect your billable hours instead of drowning in admin.
If your billable percentage is low because quoting, scheduling, and chasing payments eat your evenings, fixing that raises your effective rate without touching the price you charge. That is the quiet lever most contractors ignore.
Brivium keeps your math working in the real world: send branded quotes in minutes, schedule crews without the phone tag, and get paid faster with card payments on the job, so more of your hours stay billable.
Start free trialReview and adjust, don't set and forget
Your rate is not a tattoo. Insurance goes up, fuel spikes, a new truck payment lands. Revisit your numbers at least once a year and any time a major cost changes. Track your actual billable percentage over a few months and compare it to your estimate. If you assumed 60 percent and you are really hitting 45, your rate needs to come up or your admin needs to come down.
Price in ranges while you test. Quote slightly higher on jobs you don't desperately need and watch your close rate. The market will tell you where the ceiling is. The goal is not the highest rate you can charge once, it is the sustainable rate that keeps you profitable job after job.
Frequently asked questions
What is a typical construction hourly rate in the US?
It varies widely by trade, region, and whether you are solo or running a crew, but many field pros land somewhere between $60 and $125 per hour once overhead and profit are included. Your own number should come from your costs, not an average.
How do I calculate my billable hours?
Start with your total hours worked, then subtract non-billable time: driving, material runs, quoting, admin, and equipment upkeep. Most contractors end up billing 50 to 75 percent of the hours they actually work.
Should I charge more if I hire employees?
Yes. Employees add payroll taxes, workers' comp, training, and supervision time to your overhead. Rebuild your rate with those costs included rather than reusing your solo number.
Why is my competitor cheaper than my calculated rate?
They may have lower overhead, a paid-off truck, higher material markup, or they may simply be underpricing and losing money. Use their rate as a market check, not as a reason to drop your own math.
