What Should a Concrete Pro Charge Per Hour?

Ask ten concrete pros what they charge per hour and you will get ten different answers, and most of them are guesses. Somebody heard a competitor says $75 an hour, so they say $75 too. The problem is that number tells you nothing about whether you actually make money. Your concrete hourly rate should come from your own costs, your own income goals, and the real number of hours you can bill in a week. Let's build that number from the ground up, the same way you build a slab: foundation first.
Key takeaways
- Your hourly rate should be calculated from target income, overhead, and billable hours, not copied from a competitor.
- Billable hours are a fraction of your working hours. Quoting, driving, and admin do not pay unless you bake them in.
- Overhead recovery is where most concrete pros bleed money. Insurance, truck, fuel, and tools all live in your rate.
- Think in ranges, not a single magic number. Your rate shifts with job type, risk, and region.
Start With the Income You Actually Want
Work backwards, not forwards. Decide what you want to take home in a year, then reverse-engineer the rate that gets you there. Say you want $85,000 in personal income before taxes. That is your target, and your rate has to cover it after every business cost is paid. If you set your rate first and hope the income follows, you are flying blind.
Be honest about the number. Account for the slow season, the rained-out weeks, and the jobs that go sideways. A target that looks great on paper falls apart if you assumed 52 perfect weeks a year. Nobody in concrete gets 52 perfect weeks.
Billable Hours Are Not the Same as Working Hours
Here is the trap that sinks most rates. You might work 50 hours a week, but you do not bill all 50. You bill the hours your hands or your crew's hands are on a job. The rest goes to estimating, driving between sites, chasing material, answering the phone, invoicing, and cleaning the truck. That time is real, but a customer never pays for it directly.
For a lot of small concrete operations, billable hours land somewhere in the 50 to 65 percent range of total working hours. If you work 45 hours a week and only 27 of those are billable, your rate has to cover your whole business on those 27 hours. That math changes everything.
Quick gut check
Track one normal week. Write down every hour that was truly on a job versus driving, quoting, or admin. The ratio will surprise you, and it is the single most important input to your rate.
Add Up Your Overhead Honestly
Overhead is everything you pay to stay in business whether you pour concrete that day or not. Most pros underestimate this badly, which is why their rate feels fine until the year-end numbers come in short.
For a solo or small concrete business, typical overhead buckets include:
- Liability and workers comp insurance
- Truck payment, fuel, and maintenance
- Tools, forms, mixers, and replacement wear items
- Licensing, permits, and bonding
- Phone, software, and bookkeeping
- Marketing and your website
- Equipment repair and the occasional rental
Add it all for a year. Even a lean solo operation can run $25,000 to $45,000 in annual overhead once you count the truck and insurance. A crew with more equipment runs a lot higher. This number has to be recovered across your billable hours, on top of your target income and your labor cost.
A Worked Example You Can Steal
Let's build a rate for a solo concrete pro with occasional help. The goal is to show the method, so adjust every number to your own reality.
- Target personal income: $85,000 for the year.
- Annual overhead: $35,000 (insurance, truck, fuel, tools, software, marketing).
- Total you need the business to generate before profit: $120,000.
- Working weeks per year: 46 (accounting for slow season, weather, and time off).
- Working hours per week: 45. That is 2,070 working hours.
- Billable ratio: 55 percent. That is roughly 1,138 billable hours.
- Required rate: $120,000 divided by 1,138 equals about $105 per hour.
That $105 is your break-even-plus-income rate, and it still has no cushion for profit margin or surprise costs. Many pros add 10 to 20 percent on top as real profit, which pushes the rate toward $115 to $125. Now compare that to the competitor charging $75. If you matched them, you would be roughly $30 an hour short of your own goal, every single billable hour, all year. That gap is why copying a rate quietly loses money.
The point of the math
The exact numbers are yours. The method is universal. Target income plus overhead, divided by billable hours, then add profit. Do this once and you will never guess at a rate again.
Why Ranges Beat a Single Rate
No serious concrete pro charges one flat rate for everything. A straightforward flatwork pour is not the same job as a stamped, colored patio with tricky access or a structural footing on a slope. Your calculated rate is your floor. From there, you flex up for:
- Higher skill or finish work like stamping, staining, or exposed aggregate
- Jobs with more risk, callback exposure, or difficult access
- Tight timelines that disrupt your schedule
- Materials and conditions that eat more labor than they look like
Think of your rate as a range, not a promise. The low end is for clean, repeatable work. The high end is for anything that carries extra skill, risk, or hassle. Quoting this way protects your margin instead of hoping the easy jobs cover the hard ones.
Turn Your Rate Into Quotes and Paychecks
A rate only matters if it survives contact with the customer. Most concrete jobs are bid as a total price, not an hourly line item, so you need to estimate the hours honestly, apply your rate, add materials with markup, and present it clean. If your estimate underprices the hours, your perfect rate still loses money on that job.
The other half is getting paid for what you quoted. A sharp bid followed by slow invoicing, a lost deposit, or a payment you had to chase for three weeks quietly cuts into the rate you worked so hard to calculate. Tight quoting and fast collection are part of the rate, not separate from it.
Brivium helps concrete pros turn a solid hourly rate into branded quotes that win, keep the schedule full, and get paid faster with card payments and invoices, so the number you calculated is the number you actually keep.
Start free trialReview and Adjust, Then Do It Again
Your rate is not a tattoo. Insurance goes up, fuel swings, your skill improves, and your target income grows. Recalculate at least once a year, and anytime a big cost changes. The pros who stay profitable treat their rate like a living number, not a sign they hung up once in year one and never looked at again.
Build it from your own numbers, quote in ranges, collect fast, and revisit it regularly. Do that, and you will know exactly why you charge what you charge, which is more than most of your competitors can say.
Frequently asked questions
What is a typical concrete hourly rate in the US?
It varies widely by region, skill, and overhead, but many concrete pros land in the $75 to $125 per hour range once they calculate from income and costs. The right number for you depends on your own billable hours and overhead, not an average.
Why shouldn't I just match my competitor's rate?
Their rate reflects their costs, crew size, and income goals, not yours. Copying it can leave you short by tens of dollars per billable hour. Calculate your own rate from target income, overhead, and real billable hours instead.
How do I figure out my billable hours?
Track one normal week and separate time on actual jobs from driving, quoting, admin, and material runs. For many small concrete operations, only 50 to 65 percent of working hours are billable, and that ratio drives your rate.
Should concrete be priced hourly or by the job?
Most jobs are bid as a total price, but that price should be built from an honest hours estimate times your hourly rate, plus materials and markup. The hourly rate is the engine behind an accurate flat bid.