Construction
Hiring Your First Construction Employee

You can only swing so many hammers in a day. At some point the backlog gets long enough that turning down work hurts more than the cost of paying someone. That is usually the moment solo contractors start thinking about hiring their first construction employee. The trick is knowing when the numbers actually justify it, what to hand off first, and how to keep two people in the field from stepping on each other. Here is the contractor-to-contractor version, no fluff.
Key takeaways
- Hire when your calendar is consistently full and you are leaving billable work on the table, not just on a busy week.
- Delegate the repetitive, lower-skill labor first so you stay on the work that actually needs you.
- More people in the field means more coordination. Lock down scheduling and communication before day one.
- Know your true loaded labor cost, including payroll taxes and downtime, not just the hourly wage.
When the numbers actually justify a hire
The emotional signal to hire is feeling buried. The financial signal is more specific: you are consistently booked out and declining jobs you could profitably take. One slammed week is not a trend. Six to eight weeks of a full calendar with real work turned away is.
Run the math before you post a job. Say you can bill out at $85 an hour and you are turning down roughly 15 billable hours a week because you simply run out of daylight. That is about $1,275 a week in work you are walking away from, or roughly $5,000 a month.
Now cost the hire. A laborer at $22 an hour is not really $22. Add payroll taxes, workers comp, and a buffer for non-billable time like drive time and setup, and your loaded cost often lands in the $28 to $34 an hour range. At $30 loaded for 40 hours, that is about $1,200 a week.
The simple test
If the revenue you can capture by freeing up your own time clears your loaded labor cost with margin to spare, the hire pays for itself. In the example above, $5,000 of recaptured monthly work against roughly $4,800 in monthly labor is close. You want a wider gap than that before you commit.
If the gap is thin, consider a 1099 subcontractor or part-time help first to test demand without the full commitment. Just be honest about worker classification rules so you do not misclassify an employee as a contractor.
What to delegate first
The instinct is to hire someone who can do everything you do. That is a mistake for a first hire, and those people are expensive and rare. Instead, offload the work that eats your hours but does not require your judgment or license.
- Material runs, loading, and unloading
- Site prep, demo, and cleanup
- Hauling, staging, and basic grunt labor
- Repetitive install work you can hand off after a quick walkthrough
- Tool and jobsite organization at open and close
The goal is to protect the hours that only you can bill: the skilled work, the client conversations, the estimates, and the problem-solving. Every hour you spend on cleanup is an hour you are paying yourself $85 to do a $22 task.
Hold back anything tied to code compliance, final quality checks, and customer-facing decisions until you trust the person and know their skill level. Build up from there.
Writing a job post that filters for the right person
Be specific or you will drown in unqualified applicants. Name the trade, the physical demands, the schedule, the pay range, and whether a valid license and reliable transportation are required. Honesty here saves you from no-shows and early quits.
- State the exact role: general laborer, apprentice carpenter, helper, and so on.
- List the real requirements: lifting, early starts, outdoor conditions, drug testing if you do it.
- Give a pay range. Posts with no pay get ignored by good people.
- Describe your company in two honest sentences. A solo operator building a crew attracts different folks than a big outfit.
- Ask for one simple proof of reliability: references or a short note on their last job.
Reliability beats raw skill
For a first hire, someone who shows up on time every day and follows instructions is worth more than a flashy resume who ghosts you twice a month. You can teach skills. You cannot teach up.
Keeping jobs coordinated with two people in the field
When it is just you, the schedule lives in your head. Add one person and that breaks fast. Now someone needs to know where to be, what to bring, what the client expects, and what to do if you get held up on another site.
The failures are predictable: your helper shows up to a job with the wrong materials, waits around because the client was not home, or does work that has to be redone because the scope was in your head and not written down. Every one of those is money lost.
Get these three things out of your head and into one place both of you can see:
- The schedule: who is where, what time, and for how long.
- The job details: scope, materials, client name and gate code or access notes, and any special instructions.
- A communication channel: a fast way to call or text without handing out your personal cell to every client.
A shared calendar beats a group text that scrolls away. The moment your helper can check the day's jobs without calling you, you stop being the bottleneck. That is the whole point of hiring: to free your attention, not just your hands.
Payroll, paperwork, and protecting yourself
Before day one, handle the legal basics so a good hire does not turn into a liability. Rules vary by state, so confirm specifics locally, but the universal checklist looks like this:
- Get an EIN from the IRS if you do not have one.
- Register for state payroll and unemployment accounts.
- Set up workers compensation insurance. In most states this is mandatory the moment you have an employee, and in construction it is not optional.
- Have the employee complete I-9 and W-4 forms.
- Pick a payroll method so taxes are withheld and filed correctly.
- Confirm your general liability coverage reflects that you now have a crew.
Workers comp is the one people skip to save money and it is the one that can end a business. One injury without coverage can cost more than years of premiums. Do not run that risk.
Setting your new hire up to actually make you money
The first two weeks decide whether this works. Spend real time walking the person through how you want things done, then step back and let them do it. Hovering defeats the purpose and burns your billable hours.
Watch two numbers: billable utilization and rework. If your helper is busy on productive work most of the day and you are not redoing their output, the hire is paying off. If they are standing around waiting on direction, that is a coordination problem you can fix with better scheduling and clearer job notes, not a bad hire.
Brivium keeps your crew on the same page as you grow: branded quotes go out fast, jobs and schedules live in one place everyone can see, and you get paid by card on site without chasing checks.
Start free trialGoing from one to two is the hardest jump you will make. Get the numbers right, hand off the right work, and keep the coordination tight. Do that and your first hire stops being a cost and starts being the reason you can finally take on the jobs you used to turn down.
Frequently asked questions
How do I know if I can afford my first construction employee?
Compare the billable work you are currently turning away against your loaded labor cost. Loaded cost includes wages plus payroll taxes, workers comp, and non-billable time, usually landing well above the base hourly rate. If recaptured revenue clears that cost with margin, you can afford the hire.
Should my first hire be a W-2 employee or a 1099 subcontractor?
It depends on how much control you have over their work. If you set their hours, direct their tasks, and provide tools, they are usually an employee. Misclassifying to save on taxes can trigger penalties. When demand is uncertain, a true subcontractor or part-time help can test the waters first.
What should I delegate to a new construction hire first?
Start with repetitive, lower-skill labor: material runs, site prep, demo, cleanup, hauling, and simple install work after a walkthrough. Keep code compliance, final quality checks, and customer decisions for yourself until you trust their skill level.
How do I keep jobs coordinated once I have a crew?
Get the schedule, job scope, and client details out of your head and into one shared place both of you can access. Use a reliable way to communicate that does not rely on scrolling text threads, so your helper can check the day without calling you for every detail.
