Hiring Your First Concrete Employee

The Brivium Team8 min read
Hiring Your First Concrete Employee illustration

Going from a one-person concrete operation to a two-person crew is one of the biggest jumps you will make. Do it too early and you are paying wages out of pocket on slow weeks. Do it too late and you are turning down pours, working 70-hour weeks, and burning out before the summer even ends. This post walks through when the numbers actually justify a hire, what you should hand off first, and how to keep jobs coordinated once there is more than one truck rolling out in the morning.

Key takeaways

  • Hire when you are consistently turning down profitable work or when your own time is the only thing capping your revenue.
  • Delegate the physical grunt work and setup first, not the estimating, customer contact, or finishing.
  • A first hire usually needs to add more billable throughput than they cost in wages, taxes, and downtime before it pays off.
  • Coordination breaks down fast with two people unless quotes, schedules, and payments live in one place instead of your head.

Know When the Numbers Actually Justify a Hire

The gut feeling that says "I am slammed" is not the same as the math that says "I can afford this." A lot of concrete guys hire off exhaustion, then panic when February shows up. Before you post a job, look at three things: how much work you are turning away, how booked out you are, and how much of your revenue is capped purely by your own two hands.

If you are booked three or four weeks out and still saying no to driveways, patios, or small commercial flatwork, that turned-away work is your signal. A second set of hands does not just double labor, it lets you take on the jobs you currently cannot physically reach.

Quick gut check

If you have said no to at least a few profitable jobs in the last month because you ran out of hours, not because the customer was cheap, you are probably ready.

A Worked Example: Does the First Hire Pay Off?

Let us run real numbers so you are not guessing. Say you pay a laborer 20 dollars an hour. Once you add payroll taxes, workers comp for concrete work, which runs high, and a little cushion for slow days, your true cost is closer to 28 to 32 dollars an hour. Call it 30.

At 30 dollars an hour for a 40-hour week, that hire costs you about 1,200 dollars a week, or roughly 62,000 dollars a year assuming steady work.

Now the upside. With a helper handling prep, forming, and cleanup, most solo operators find they can either take on one extra small job per week or knock a full day off larger pours. If your average job nets 1,500 to 2,500 dollars in profit and you add even one modest extra job most weeks, you are looking at 6,000 to 10,000 dollars of additional monthly revenue against a labor cost near 5,000.

The math works when the throughput gain clears the wage plus overhead. It does not work if you hire and keep doing all the same jobs at the same pace with an extra person standing around. The hire has to unlock capacity you were not touching before.

What to Delegate First

Here is where a lot of owners get it backwards. They hand off the wrong things. Your first hire is almost never ready to bid a job or run a finish, and those are the tasks that make or break your reputation. Protect them.

Delegate the physical, repeatable, teachable work first:

  • Site prep: grading, subgrade compaction, gravel placement.
  • Forming and stripping forms.
  • Rebar and mesh placement, chair setting.
  • Loading and unloading the trailer, tool and equipment care.
  • Cleanup, washout, and hauling debris.
  • Wet concrete labor: moving, screeding, and bull floating under your direction.

Keep these to yourself until they have earned trust: final finishing and edging, jointing decisions, estimating and pricing, and direct customer conversations about scope or change orders. A blown finish on a stamped patio costs you a callback and a reputation. Let them prove out on the hard labor first, then teach finishing on your own shop pad or on low-visibility work.

Teach the standard, not just the task

When you show a new guy how you set forms or float a slab, explain why. "We overbuild forms here because a blowout on a 6-yard pour is a lost day" sticks better than "do it this way." A crew that understands the standard makes fewer expensive mistakes when you are not standing over them.

Keeping Jobs Coordinated With Two People in the Field

When it was just you, the schedule lived in your head and your truck. That falls apart the moment a second person needs to know where to be, what to bring, and what the customer expects. The most common growing-pain in concrete is not the labor, it is coordination: the helper showing up to the wrong address, the forms not loaded, the ready-mix ordered for the wrong window.

Get these out of your head and into something you both can see:

  1. A shared schedule with addresses, pour times, and who is responsible for what.
  2. A job scope both of you can pull up: square footage, thickness, finish, and any customer notes.
  3. A materials checklist per job so nobody drives to the site without the mesh.
  4. A simple way to confirm the ready-mix order and arrival window, since a truck waiting on-site costs money in standby fees.

The coordination tax

Every job detail that only lives in your memory becomes a phone call, a wrong turn, or a wasted trip once you have a crew. Write it down once, share it, and stop repeating yourself.

Protect Your Margin While You Scale

Two things quietly eat profit when you add a person: idle time and sloppy billing. Idle time happens when the schedule has gaps, a job runs short, and now you are paying wages for a guy sitting in the truck. Batch jobs geographically and line up the next task before the current one wraps so nobody is standing idle.

Sloppy billing happens when you are too busy running two jobs to send invoices the same day. The longer a concrete invoice sits, the slower it pays. Send it the day the job is done, while the fresh slab is still impressing the customer, and make it easy to pay on the spot.

Brivium keeps your quotes, schedule, and payments in one place, so you can send a branded quote, dispatch your new hire to the right address, and collect payment by card the day the pour cures, all without juggling three apps.

Start free trial

Setting Your New Hire Up to Stay

Concrete labor is physical and turnover is real, so a good first hire is worth keeping. Pay on time, every time, without excuses. Be clear about the standard and give feedback the same day, not two weeks later. And give them a path: today they set forms, in six months they are finishing, in a year they might be running a second crew for you. People stick around when they can see the next rung.

Your first hire is a test of your systems as much as their work ethic. If the jobs stay coordinated, the billing stays clean, and the margin holds, you have just proven you can run a crew instead of a one-man show.

Bottom Line

Hire when you are consistently turning away profitable work and your own hours are the only ceiling on revenue. Delegate the heavy, teachable labor first and guard the estimating and finishing until trust is earned. Then get your schedule, scope, and billing out of your head so two people can actually work as one crew. Do that, and the first hire pays for itself and sets up the next one.

Frequently asked questions

How do I know if I can afford my first concrete employee?

Look at whether the hire lets you take on work you are currently turning away. If the extra billable throughput clears the wage plus payroll taxes and workers comp, usually 28 to 32 dollars per hour of true cost for a 20 dollar wage, the hire pays off. If your pace stays the same with an extra person, it does not.

What should I have a new concrete employee do first?

Start them on physical, teachable work: site prep, forming, rebar and mesh, loading, cleanup, and wet concrete labor under your direction. Hold off on final finishing, jointing, estimating, and customer scope talks until they have proven themselves.

How do I keep jobs coordinated once I have a crew?

Move job details out of your head into a shared schedule and job scope both of you can see: addresses, pour times, square footage, finish, materials checklists, and the ready-mix window. That prevents wrong-address trips and forgotten materials.

How do I protect my margin after hiring?

Watch idle time and slow billing. Batch jobs by location and line up the next task so nobody sits idle, and invoice the day the job is done with an easy way to pay on the spot so cash comes in faster.